T-00 3D Layout Checklist — Restart Basis
This checklist governs the next 3D mockup. It is based on every image currently in 8x26-reference, the revised requirements in version2.md, and the owner's latest placement corrections.
Actual trailer geometry to preserve
- 8.5-foot by 26-foot enclosed trailer shell and 7-foot-6-inch interior height.
- Full-width rear ramp, shown closed and incorporated into the finished rear wall.
- Tandem wheel wells in their actual positions on both long walls; cabinetry must bridge or terminate around them logically.
- Factory employee door retained on the door-side wall near the hitch end.
- Angled/V-shaped interior transition at the hitch end, as visible in the interior reference photos.
- Clear central aisle and unobstructed path from the employee door.
Strategic zoning from rear to hitch
Continuous wet wall — wall opposite the employee door
- Enclosed restroom attached to this wall; exact rear-versus-front position requires owner confirmation.
- Permanent toilet with black-water tank directly below or immediately adjacent inside a serviceable cabinet.
- Commercial three-compartment sink with required drainboards.
- Dedicated handwashing sink outside the restroom.
- Electric water heater, pump, filters, valves and accessible service cabinet.
- Approximately 65-gallon potable-water tank hidden under the wet counter and positioned close to the axle zone.
- Gray-water tank hidden under the wet counter, concentrated below the sinks and balanced near the axle zone.
- Two commercial two-group espresso machines and two adjacent grinders.
- Two commercial coffee brewers and electric tea-water dispenser.
- Open-top commercial ice machine/bin retained near beverage production.
- Undercounter refrigerator retained near beverage production.
- Drive-through service window on this wall, opposite the factory employee door, with low pass shelf, POS and stool clearance.
- No plumbing-intensive equipment split onto the dry-storage wall.
Dry-storage and heating wall — factory employee-door side
- Employee door and its inward clearance remain completely unobstructed.
- Full-size commercial refrigerator/freezer combination retained.
- Long cleanable preparation counter.
- Commercial microwave and countertop air fryer for reheating only.
- Full-height dry pantry and organized shelving for cups, lids, sleeves, napkins and restock inventory.
- Ingredient drawers for beans, tea and small beverage ingredients.
- Syrup/flavor storage and smallwares storage.
- Compact wall-mounted network rack, operational display connection and POS/network pathways.
Hitch-end electrical and exterior power zone
- Shore-power entry, main electrical panel, transfer equipment, inverter/charger and protected battery bank located behind the employee-door area at the V-shaped hitch end.
- Electrical equipment physically separated from wet plumbing and provided with service clearance.
- Exterior weather-protected, ventilated generator enclosure added at the tongue/hitch end.
- Generator exhaust, heat and fuel arrangement kept outside the occupied trailer and away from openings.
- Mini-split condenser placed outside with ventilation and service clearance; interior head positioned for unobstructed circulation.
- Final sizes remain subject to nameplate load calculation and weight/tongue-load analysis.
Non-negotiable exclusions
- No customer-accessible interior and no walk-up service counter.
- No pastry display case.
- No grill, griddle, range, deep fryer, open flame or raw-food cooking line.
- No propane water heater.
- No second full-size refrigerator/freezer.
- No blocked service window, employee door, restroom door or central aisle.
- No tanks exposed in the finished interior; access panels must remain serviceable.
Rendering sequence
- Model the actual empty shell, ramp, wheel wells, employee door and hitch-end V transition.
- Add the enclosed restroom at the owner-confirmed end of the wet wall.
- Add black, gray and potable tanks under the associated wet-wall zones.
- Add sinks, water heater, pump and filtration in a short plumbing run.
- Add espresso, brewing, tea, ice and undercounter refrigeration in workflow order.
- Add the service window, pass shelf, POS and clear seated handoff area.
- Add the dry wall: full-size refrigerator/freezer, heating appliances, preparation and dry storage.
- Add the hitch-end electrical zone behind the employee door.
- Add the exterior generator enclosure and mini-split components.
- Check door swings, aisle width, wheel-well conflicts, service access, equipment count and weight concentration before saving the render.